COMMERCIAL-IN- CONFIDENCE FINANCIAL ASSISTANCE FOR MINERAL EXPLORATION (M.E.I.G.A.) COMPANY: CONSOLIDATED GOLD FIELDS LTD REF: AE 173 MRD 84/2/9 PROJECT: GAIRLOCH MRD 144/2/9 The following file material is held by B.G.S. in London, Keyworth and Edinburgh. - Parts of the application submitted 25.1.78, stage 1: Appx 1. "Exploration Project" 4 pages. E. Jones. 21.12.77 Fig 1 Loch Maree Series 2 Outcrop map. "Mineralised Zone" 1 : 500 3 Channel Sampling Zone A. 1 cm : 1 m 4 " " " B. 1 cm : 1 m 5 Soil sampling results: Copper, Zinc 6 Electromagnetic Survey Low Frequency Out of Phase component 7 Trenching Programme 8 Trench Profile line 150 9 Trench Profile line 00 Appx 2. "Proposed Work Programme". « page Location map. 1" : 4 miles - Part of application submitted 18.8.78. Stage 2 Appx 1. "Technical Report" 2 pages with the following: Fig 1. Gairloch Drillhole Site Plan 1 : 2,500 Geological logs GBH 1 - 10 Sulphide logs GBH 1 - 6, 8, 9 Graphic logs GBH 1 - 10 Appx 2. Proposed work programme - Technical Report covering Phase 2, 1.7.78 to 30.6.79, and Phase 3 (part), 1.7.79 to Mid October 1979 3 pages with the following: Geological and Sulphide Logs GBH 11 to 51 Petrological Study Part 1 by C.M. Rice (about 30 pages) Fig 1. Borehole Collar Location Plan Fig 2. Electromagnetic. Ore Zone High Frequency Real Component Fig 3. " " " " " " Imaginary Component Fig 4. " " " " Low " Real Component Fig 5. " " " " " " Imaginary Component Fig 6. " " East Ore Zone High " Real Component Fig 7. " " " " " " Imaginary Component Fig 8. " " " " Low " Real Component Fig 9. " " " " " " Imaginary Component Fig 10. " " Area A High " " Real Component Fig 11. " " " " " " Imaginary Component Fig 12. " " " " Low " Real Component Fig 13. " " " " " " Imaginary Component Fig 14. Mise-a la masse Induced Polarization East Ore Zone Chargeability Fig 15. " " " " " " " " " " Fig 16. Magnetometry Survey - Part of application 2.7.80. Stage 4: Appx 1. Technical Report. 3 pages with the following: Map 1. Topography and Sample Points within and adjoining the Gairloch main drilled area. Scale: 1 : 1,000 Map 2. Topography and Sample Points: Western Ore Zone Extension. Scale: 1 : 1,000 Map 3. Topography and Sample Points: Eastern Ore Zone Extension. Scale: 1 : 1,000 Map 4. Borehole Location Plan. Scale 1 : 1,000 Map 5. Borehole Location Plan - showing drillholes in plan. Scale: 1 : 500 Map 6. Geological Map of the Gairloch Site. Scale: 1 : 1,000 Fig 1. Sectional Profile on Line 150E showing Geology and Mineral Zones in Boreholes GBH Nos. 26, 35, 39 and 63. 1 : 250 Table 1. Summary of Phase 3 Reconnaissance Drilling Appx 2. Proposed work programme. 1 page (Phase 4) - Gairloch Borehole Sections: Ref No Section Boreholes 173/31 210E 59/60 173/32 180E 55 173/33 150E 51 173/34 125E 44 173/35 100E 42/43/61 173/36 50E 35/39/63 173/37 30E 23/30/32/33 173/38 00 6/20/34 173/39 20W 19/29/31 173/40 34W 18/25/28 173/41 56W 16/1 173/42 58W 4/21/22/17/2/3/15/14 173/43 72W 11/12/13 173/44 Mag susceptibility 51 T. Coleman Dec 81 - Appendices 1 and 2 of application for stage 5 submitted 28.6.82: Appx 1. 'Technical report 1.7.80 to 31.5.82'. 5 pages. Phases 4a and 4b Appx 2. 'Proposed work programme. Phase 5'. 2 pages, with the following: Map A Area for deep drilling. Phase 5. 1 : 50,000 Fig 1. Plan showing locations of borehole collars (up to GBH 84) and plan traces of the boreholes, together with mineralised intersections 1 : 1,000 Fig 2. Location map of lithogeochemical sample lines 1 : 10,560 Figs 'Graded Dot' plans showing distribution of lithogeochemical elemental 3-9. values 1 : 1,000 Total number of plans is 42: Gairloch ore zone: Cu, Zn, Mn, Pb + Ba, Sr, Cr, Al2O3 : TiO2 Kerry area: Cu, Zn, Mn, Pb + Ba, Cr, Al2O3 : TiO2, TiO2 : Zn Gairloch Western Extension of the Ore Zone: Cu, Zn, Pb + Ba + Ra, Cr, Al2O3 : TiO2, TiO2 : Zr Garbh Airigh: Cu, Zn, Ba + Pb, Cr, Al2O3 : TiO2, TiO2 : Zr, Mn Sidhean Mor - North West: Cu, Zn, Ba, Cr, TiO2 : Zr Sidhean Mor - South East: Cu, Zn, Ba + Pb, Cr, TiO2 : Zr Meall Aundrary: Cu, Zn, Ba + Pb, Cr, TiO2 : Zr Fig 10. Composite plan showing locations of boreholes (GBH 70-77) in 'outlying' areas relative to the main drilled zone shown in Fig 1 1 : 10,560 Fig 11. Vertical longitudinal section (on Station 00) of Western Ore Zone showing borehole profiles of core fractures per metre 1 : 500 Fig 12. Vertical longitudinal section (on Station 00) of Eastern Ore Zone showing borehole profiles of core fractures per metre 1 : 500 Table 1 Comparative laboratory results for drillcore samples with original gold assays exceeding 5 g/t Table 2A Re-analysis results for Cu and Zn in selected drillcore samples (GBH 55, 63, 67) Table 2B Re-analysis change in drillhole intersection values for Cu and Zn (GBH 55, 63, 67) Table 3 Specific gravity test results on borehole ore intersections (GBH 1, 4, 20, 23, 29, 35, 44, 51, 55, 61, 63, 67, 68, 80) - Maps and sections, Stage 4, enclosed with letter dated 9.8.84 Fig 3 .... Wester Ross .... Geological map of the Gairloch metamorphic belt. 1 : 10,560. 1983. Tweedie Fig 5 Geology of Ore Zone and Teangadh Bhuidhe Mhor .... J. Tweedie. March '81. 1 : 1,000 Fig 6 Gairloch drilling line 200W. Western Ore Zone. 1 : 250 Fig 7 " " " 150E. Eastern Ore Zone. 1 : 250 Fig 8 Vertical longitudinal section in place of Dip of Main thrust. 1 : 1,000 - Geological and sulphide drill logs GBH 11 to 51. Ore Zone Area. E. Jones - Fotobore logs GBH 51 to 87B. E. Jones - Technical report April 1982 November 1983. 2 pages with the following: Borehole logs 83A, 85, 85A, 86, 87 and 87A Fig 1. Borehole Location Plan. 1 : 1,000 Fig 2. Block Diagram of Postulated Major Fold. 1 : 10,000 Fig 3. Ore Horizon correlation hypothesis Fig 4. Mise-a-la-Masse Survey. Teangadh Bhuidhe Mor. 1 : 1,000 "Report on preliminary flotation tests of Gairloch samples No: OKMT-19-82. 2.4.1982. Outokumpu Oy - Geological and sulphide drill logs GBH 1 to 84 1